The campaign, up to 45 days, will commence at the end of 2020 or in early 2021 utilising one of our Managed Pressure Drilling systems deployed on either the Stena IceMAX, Stena Forth or Stena DrillMAX.
The last well in the area was drilled in 1984 and a lot of study has gone into the geology since then, meaning MPD is required to drill this well.